Quote Originally Posted by AbuMaia View Post
It takes my 8x8 bed about 8-20 minutes to get up to 120C, running through a relay off my 12v 30A power supply, with cork between the HBP and the wood Y bed.
The 8" bed, in theory, should only require 64% the energy needed by the 10" to maintain a given temperature. Something I did not consider before pulling the trigger on the 10"!

Jim