    When you get to putting the heat plate on the y-bed use 4 extra lock nuts (in my kit he supplied more than enough to do this). Install a screw and lock nut to the heat plate first and tighten down so the screw can't turn. Then adjustments will be one handed with just one wrench from the bottom, and later if you print some thumb wheels the change will be really simple.

  2. #22
    Getting the electronics pieced together and I also did the spool holder








    I've come to the end of what I can do as there was a bag of fasteners and a couple metal brackets that were not in the package. A quick email exchange with Colin (everybody is right, he does consistently answer within a few minutes) and the parts were mailed with a tracking number amazingly fast. However, now I have to impatiently wait for USPS to deliver to me up here in the Great White North.

  3. #23
    Quote Originally Posted by Dustin B View Post
    When you get to putting the heat plate on the y-bed use 4 extra lock nuts (in my kit he supplied more than enough to do this). Install a screw and lock nut to the heat plate first and tighten down so the screw can't turn. Then adjustments will be one handed with just one wrench from the bottom, and later if you print some thumb wheels the change will be really simple.
    OH, I like that one. Thanks for the tip again.

  4. #24
    Student Adamseye's Avatar
    Join Date
    Jan 2016
    Location
    Ocean County NJ
    Posts
    19
    I hear you on the patience, I have sent over 5 emails and called over 3 times to get the replacement parts for my wanhao. Blah Blah about got me mad. Well it did get me mad, then I did this. 20160303_210829.jpg

  5. #25
    Technician
    Join Date
    Nov 2015
    Posts
    73
    I got lucky in that the only thing I was missing was the hotend mounting plate and I was able to make my own. Still don't have the part from Colin yet. I'm also in the great white north. Should get it on the 8th. Not sure if I'll change it out or not.

  6. #26
    Flatty did you get your pegasus assembled?
    I did a few test prints over the weekend, first 3 came out pretty good, last one ran overnight and looks like the bed moved up/down twice during heating. I changed the code to PID control the Fet board im using.

  7. #27
    Quote Originally Posted by Donziboy2 View Post
    Flatty did you get your pegasus assembled?
    I did a few test prints over the weekend, first 3 came out pretty good, last one ran overnight and looks like the bed moved up/down twice during heating. I changed the code to PID control the Fet board im using.
    No, I'm at a standstill waiting for a couple parts... they should be here in the next day or two I hope. I have been reading about people switching from bang bang to PID control and I may look into that as well but I'm just going to get the printer going first and see how things go from there.

  8. #28
    OK, I'm back in business and continuing the build. Next up are the Z motor brackets. The parts required are pictured below:




    After putting things together it looks like this





  9. #29
    Next is the Y motor bracket




  10. #30
    It's finally time to start assembling the frame






Page 3 of 13 FirstFirst 12345 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •