Close



Results 1 to 10 of 110

Threaded View

  1. #26
    Staff Engineer LambdaFF's Avatar
    Join Date
    Jan 2014
    Location
    France, Aix en Provence
    Posts
    1,139
    Quote Originally Posted by positronicman View Post
    Care to share?
    Well, I'll try and summarize the facts.

    At the backers' request, the last update goes into detail over :
    - the manufacture planning for the 1st batch destined to early bird backers + reviewers.
    - why they are priorizing reviewers over the rest of the backers.
    - the reasons behind the revised planning (early birds were supposed to ship september 2014).
    - their confidence regarding the second batch for the rest of the backers.

    It was a lengthy update and it covered more but that's the gist of the facts.

    As with such projects, time will show.

    As with such delays, not everyone is happy (and I'm really polite here).
    Last edited by LambdaFF; 07-09-2015 at 03:18 AM.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •