Close



Results 1 to 10 of 29

Threaded View

  1. #18
    Student CTC-USA's Avatar
    Join Date
    Mar 2015
    Location
    NH, USA
    Posts
    29
    Add CTC-USA on Facebook Add CTC-USA on Google+


    This is a nozzle assembly.

    Nozzle removal is : Left turn removes, Right turn tightens.
    Same for cooling tower, the long piece. They are both "threaded" as they screw into the aluminum block.

    Unscrew anything attached to this piece. You'll need to have it in order to install the PTFE correctly.

    Insert the PTFE into the Nozzle when removed. Then screw the nozzle into the aluminum block. Insert some filament through the nozzle, PTFE, and aluminum block, finally sliding on top the "cooling tower".
    Attached Images Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •