Close



Results 1 to 10 of 129

Threaded View

  1. #11
    Technologist American 3D Printing's Avatar
    Join Date
    Jan 2014
    Location
    Evergreen Colorado USA
    Posts
    159
    Add American 3D Printing on Facebook Add American 3D Printing on Google+ Add American 3D Printing on Thingiverse
    So we resliced it with a raft, which worked successfully. This object takes 2 hours and 40 minutes (with raft) on the Rep 2. On the 5th Gen it took 4 hours 37 minutes, plus the 15 minutes start-up overhead.



    BTW, in each of these side by side pictures, the 5th Gen build is on the left and the Rep 2 build is on the right. The only way I could keep them straight, as that is the way the machines are sitting on the fixture as seen at the beginning of this thread.

    Last edited by American 3D Printing; 08-08-2014 at 06:29 PM. Reason: Fix a typo

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •