Results 1 to 10 of 129
Threaded View
-
08-08-2014, 05:56 PM #11
So we resliced it with a raft, which worked successfully. This object takes 2 hours and 40 minutes (with raft) on the Rep 2. On the 5th Gen it took 4 hours 37 minutes, plus the 15 minutes start-up overhead.
BTW, in each of these side by side pictures, the 5th Gen build is on the left and the Rep 2 build is on the right. The only way I could keep them straight, as that is the way the machines are sitting on the fixture as seen at the beginning of this thread.
Last edited by American 3D Printing; 08-08-2014 at 06:29 PM. Reason: Fix a typo
BambuX1Carbon($2k) vs MarkTwo($20k)
05-31-2024, 12:45 PM in 3D Printers (Hardware)