Quote Originally Posted by jeffmorris View Post
I ordered new heating block assembly and stepper motor wires from the company that makes Flashforge and PowerSpec printers and the parts are stuck at customs for two days.
It depends on the clarity of the packing declaration and the inspector but that is the way it is with Chinese importing. Corps go through the same thing.